DESCRIPTION:
It is a project of seven (07) levels distributed as follows:
Six (06) levels of apartments
Two (02) parking levels
COMMON AREAS (Located on the roof)
Large air-conditioned and furnished lobby.
Air-conditioned and equipped gym
Large room for activities
Large decked terrace
One (01) elevator
Electric generator
TERMINATION DETAILS
Pre-installation of air conditioning
Imported faucets and sanitary equipment
Imported oak doors
Granite kitchen countertops
Imported modular kitchen
Imported porcelain tile floors
Common gas
Delivery date: MARCH 2023
STANDARD PAYMENT METHOD:
10% separation
40% initial during the construction process
50% balance, upon delivery of the apartment.
Forms of commission payments:
Upon delivery of 10%, 50% of it is paid.
Upon delivery of 30%, the commission agent's full payment is completed.DESCRIPCIÓN:
Es un proyecto de siete (07) niveles distribuidos de la siguiente manera:
Seis(06) niveles de apartamentos
Dos (02) niveles de parqueos
ÁREAS COMUNES(Ubicadas en la azotea)
Amplio lobby climatizado y amueblado.
Gimnasio climatizado y equipado
Amplio salón para actividades
Amplia terraza destechada
Uno(01) ascensor
Generadoreléctrico
DETALLES DE TERMINACIÓN
Preinstalación de aire acondicionado
Grifería y aparato sanitario importado
Puertas de roble importada
Topes en cocina de granito
Cocina modular importada
Pisos en porcelanato importado
Gas común
Fecha de entrega: MARZO 2023
FORMA DE PAGO ESTÁNDAR:
10% separación
40% inicial durante el proceso de construcción
50% saldo, a la entrega del apartamento.
Formas de pagos para comisión:
A la entrega del 10% se paga el 50% de la misma.
A la entrega del 30% se completa el pago total de al comisionista.