Exclusive urban project in Bavaro Punta Cana, ideal for investing or living.
Duplex villas of 123.41 m2
Land from 140.93 m2 to 177.83 m2
Features:
3 rooms
2.5 bathrooms
Sala
Dining room
Kitchen with breakfast bar
Balcon
Washing area
Service room
Linen closet
Unroofed terrace
2 parking spaces
Finishes and finishes:
Porcelain tile floors 60*60
Modular kitchen
Breakfast bar
Kitchen countertops in natural granite
Precious wood doors
Pre-installation of air conditioning
Pre-installation of solar panels
P92 window profiles
Floor and wall of the terrace in coral.
Amenities:
Illuminated 9-hole golf course
Freshwater and saltwater lake
Clubhouse
Green areas
Ecological circuit
Running trails
Cycling circuits
Sport fishing
Yoga practice area
Co-working and co-office spaces
Restaurants
Price from $219,900 Maintenance $150-200
Form of payment stage I:
Book US$3000
Signing of the contract 15%
During the
construction 20%
4 Cash on delivery 65%
Delivery date: March 2025
Form of payment stage II:
Book US$3000
At the signing of the contract
15%
During construction 25%
Counter-delivery 60%
Delivery date: March 2025Exclusivo proyecto urbanistico en Bavaro Punta Cana, ideal para invertir o vivir.
Villas duplex de 123.41 m2
Terrenos desde 140.93 m2 hasta 177.83 m2
Características:
3 habitaciones
2.5 baños
Sala
Comedor
Cocina con desayunador
Balcon
Area de lavado
Habitacion de servicio
Closet de ropa blanca
Terraza destechada
2 parqueos
Terminaciones y acabados:
Pisos en porcelanato 60*60
Cocina modular
Desayunador
Topes de cocina en granito natural
Puertas en madera preciosa
Preinstalación de aire acondicionad
Preinstalacion de paneles solares
Perfileria de ventana P92
Piso y pared de la terraza en coralina.
Amenidades:
Campo de golf de 9 hoyos iluminad
Lago de agua dulce y salada
Casa club
Zonas verdes
Circuito ecológico
Senderos de running
Circuitos de ciclismo
Pesca deportiva
Zona de practica de yoga
Espacios co-working y co-office
Restaurantes
Precio desde US219.900 Mantenimiento US$150-200
Forma de pago etapa I :
Reserva US$3000
Firma del contrato 15%
Durante la
construcción 20%
4Contraentrega 65%
Fecha de entrega Marzo 2025
Forma de pago etapa II:
Reserva US$3000
A la firma del contrato
15%
Durante la construcción 25%
Contra-entrega 60%
Fecha de entrega Marzo 2025