Land of 45,000 meters is finished off with water and electricity, in Puerta Palmillas, San Juan del Rio, Qro. Where the most important Industrial Corridor in Latin America begins, ending where Ciudad Toyota is being built, the land has a dam. The following documents are available: Land plan of 37,680 m2 plus 6,710 m2 of the right of way giving a total of 45 thousand m2. Plan of the Industrial Corridor. Plan of the topographic study where the land with the dam is located. Public Works Management Plan for the Edo. de Qro. where the new highway is detected, which opens in November 2023, begins on the Mexico-Querétaro highway towards Puerta de Palmillas where the land is located, continuing towards San Juan del Río, ending in the city of Querétaro. Attached is a plan of the land authorized by the Court with the right of way. The best price in the area is guaranteed. Ideal for investors.Se remata terreno de 45 mil mts con agua y luz, en Puerta Palmillas, San Juan del Rio, Qro. Donde inicia el Corredor Industrial más importante de América Latina, terminando en donde se construye Ciudad Toyota, el terreno cuenta con una represa. Se cuenta con los siguientes documentos: Plano del terreno de 37,680 mt2 mas 6,710mt2 del derecho de paso dando un total de 45 mil mt2. Plano del Corredor Industrial. Plano del estudio topográfico donde si ubica el terreno con la represa. Plano de Dirección de Obras Públicas del Edo. de Qro. donde se detecta la nueva Autopista, la cual se inaugura en Noviembre del 2023, se inicia en la carretera México-Querétaro hacia Puerta de Palmillas donde se ubica el terreno, continuando hacia San Juan del Río, terminando en la Cd. de Querétaro. Se anexa plano del terreno autorizado por el Juzgado con derecho de paso. Se garantiza el mejor precio de la zona. Ideal para inversionistas.