- 70% removal on 13,869 m2
- Up to 5 levels, however, as there is a downward slope... it could be up to 6 levels
- 30% free area- CUS 3.5
Land: 19,802.00 m2
Construction: 600 m2
180 meters from the front,
Land distributed over 4 terraces (levels) with: drinking water supply through a household outlet, two-phase electricity network with the possibility of switching to three-phase.
In the 600 m2 of construction it has: two warehouses, an office, an event room with two bathrooms.
Location: It borders the Lago de Guadalupe Federal Branch Area and the short road to Morelia. 1.8 km from Nicolas Romero Town Center.- 70% desplante en 13,869 m2
- Hasta 5 niveles , sin embargo, como hay un desnivel descendente … podría ser hasta 6 niveles
- 30% área libre- CUS 3.5
Terreno:19,802.00 m2
Construcción: 600 m2
180 metros de Frente,
Terreno distribuido en 4 terrazas (niveles) con: abastecimiento de agua potable a través de toma domiciliaria, red de energía eléctrica bifásica con posibilidad a cambiar a trifásica.
En los 600 m2 de construcción cuenta con : dos bodegas, oficina, salón de eventos con dos baños .
Ubicación: Colinda con área Federal Ramal Lago de Guadalupe y Carretera vía corta a morelia. A 1.8 km de Town Center Nicolas Romero.